Introduction
This page describes the types of signals seen on British railways and their meanings. Semaphore and colour light signals are included.
More articles on this site about signalling are listed in the Signalling Index
Contents
Semaphore Signals - Semaphore Signal Parts - Types of Semaphore Signal - Junction Signals - Subsidiary Signals - Colour Light Signals - 4-Aspect Operating Sequence - Route Signalling - Modern Shunt Signal - Some Photos - More Information (Links).
Semaphore Signals
During the 19th century a system of mechanically operated semaphore signals was developed for Britain's railways. Although there were many different and independent railway companies, by the early 20th century, signals were generally standardised, but with some variations in style and appearance. Many semaphore signals have survived to this day, although they are becoming rarer. However, there are some excellent examples still to be seen on the heritage lines operated by preservation groups all over the country.
Semaphore Signal Parts
First, a diagram of a semaphore signal and
its main parts. The signal is
normally placed on the left side of the track with the arm directed over the
offside. The standard arm is red with a white vertical band, although some older
signals were plain red. To allow the signal indication to be seen at night, the arm
is fitted with two lenses, duplicating the indication displayed. The lenses are
illuminated from behind, originally by oil lamps, later by electric lamps.
The signal is mounted on a signal post,
originally wooden but later lattice steelwork, pressed steel, old rail, and concrete
appeared at various places. Some railways could be recognised from the design of
their signal posts, the ones from the Victorian era having elaborate finials and other
attachments.
Signal posts were often tall, so that the
signal could be seen clear of engine smoke and from a distance. It was also intended
that the guard could see the signal from the rear of the train as it was part of his
duties to check signal indications.
The post is normally fitted with a ladder,
originally to allow access to the oil lamps and now retained for maintenance. The
post is often provided with a telephone linked to the signal box. The telephone is
contained in a small box with black and white diagonal stripes on the cover. The
driver or other train crew can use this to alert the signalman of the presence of
the train and to enquire why the signal remains "at danger", as we say in the
trade.
The arm of the signal is displayed in a
horizontal position to show the "stop" or "danger" indication.
The red lens is illuminated. The indication to the driver is "stop" until
either the signal indication gives "proceed" or he is given verbal authority by
the signalman to proceed.
To give a "proceed" indication, the
semaphore arm is raised to an angle of 45° as shown in the diagram. The movement of
the arm causes the green lens to replace the red lens in front of the lamp. A
"proceed" indication tells the driver that he may proceed at normal speed for
that section of line, subject to any speed restrictions displayed and according to the
speed limit of the particular type of train he is driving. Unlike many other
countries, British signals do not give a speed indication to the driver.
Some signals showed "proceed" by
lowering the arm instead of raising it. This type of signal is called a "lower
quadrant semaphore", (shown as an inset in the diagram) as opposed to the more usual
"upper quadrant" type. The lower quadrant type was much favoured by the
Great Western Railway but eschewed by others following an accident caused by a stop signal
showing a proceed indication because it drooped with the weight of snow resting on the
arm. The GWR maintained they had never had an accident caused by this type of signal
so they weren't about to change them now. Anyway, they didn't want the expense.
One final part of the signal mechanism is the
balance weight. It is linked to the cable which operates the signal. The
cable, of course, is connected to the lever in the signal box which operates that
particular signal. The purpose of the balance weight is to pull back the signal wire
when the lever is replaced in the frame by the signalman.
Types of Semaphore Signal
The following series of diagrams, with descriptions, shows the various types of semaphore signals seen in the UK.
A Home Signal or Starting Signal (left) is the stop signal described above. It is placed at the
entrance to a block and, when showing "stop", the train is forbidden to enter
the block. When a signal shows a stop or other restrictive indication, it is said to
be "on". A signal showing a proceed indication is said to be
"off".
Traditionally, at a station, each track would
have two stop signals. One, protecting the entrance to the block, was called the
Home Signal. The other, protecting the exit towards the next station or signal box,
was called the Starting Signal or Starter.
As mentioned above, this is a stop signal showing a proceed
indication - it is "off". The train may enter the block at normal
speed. In effect, this means the maximum speed applicable to this section of line
and the type of train.
To give advanced warning of the indication of a stop signal, a
"distant" signal is sometimes provided (left). This operates in the same way as
the stop signal but gives either a "caution" indication (it is said to be
"on"), shown on the left, or a proceed indication, on the right. If the distant is
"on", a yellow light shows at night. The
distant signal showing "on" tells the driver that the next stop signal is also
"on" and that he will have to stop there. The distant signal was, if
possible, located ¾ mile (1200 metres) before the stop signal. A single distant
signal will often provide a warning for both home and starting signals at a station.
The distant shows a yellow (on) or green (off) light at night. Remember that the
distant signal normally refers to more than one consecutive stop signal ahead. Thus,
when the distant is off, the driver knows that all the relevant stop signals
are off too. Each stop signal does not have its own distant signal in
rear.
Where blocks were short or stations close together, the distant
signal was often placed on the same post at the previous stop signal. The driver now
has two indications, one from the stop signal protecting the entrance to the block, the
other from the distant for the next stop signal. To avoid confusion, if the stop
signal is "on", the distant will also be "on", even if the next stop
signal happens to be "off". This is achieved by linking the two signals
mechanically - a system known as "slotting". At night, the driver will see two lights, a red over a
yellow. The red always takes precedence.
At a signal post with home and distant together, there will be
occasions when the block immediately ahead is free and the train may enter but the next
block may be occupied. In this case the driver will see the stop signal
"off" and the distant "on" as shown here. At night, he will see
green over yellow. This shows him he may proceed into the block but that the next
stop signal is "on" and he must stop there.
The third indication for a stop and distant signal is where both
are "off". The driver is being told both this block and the next are free
and he may proceed at normal speed. At night he will see green over green.
In some very restricted locations, a repeating signal is provided,
often referred to as a "banner" signal (left). It is a black band on a white disc
which repeats the position of the semaphore arm.
Junction Signals
At junctions, it has always been the custom in the UK to show a driver the route set, not just to show the permitted speed as usual elsewhere. In semaphore signalling, it was normal to split the signals as shown below.
Junction Signals (below (a)). This pair of stop signals protects a pair of diverging routes. The lower signal is "off", indicating that the diverging route to the left of the two is set and locked and the train may proceed along that route. The position of the two semaphore arms was often arranged so that one was lower than the other to indicate a slower route, usually because of a curve.
Splitting Distants (b). Junction signals also have an equivalent distant set up. These are always referred to as "splitting distants". They provide advance warning of the position of the junction signals and they operate in the same way as regular distants.
There are also combined versions of the splitting distant (c) where a
stop signal is placed over the distant for the main route. Either of the distants
can only show "off" if the stop signal is also "off".
The above list is basically all there is to British main line semaphore signalling. Of course, there are additional signals used for shunting and other local operations as follows.
Subsidiary Signals
The upper signal shown in this diagram (left) was a typical shunt signal, used to allow movements into and
out of a siding. It was a miniature semaphore signal with red and green lamp
indications. Both upper and lower quadrant varieties were common. The signal
was placed on a short post at ground level or was attached to a signal post below a normal
stop signal.Subsidiary signals are those used for restricted train movements. These
sorts of movements take place within a single block or in and out of sidings. The
proceed indication to the driver was a restricted movement saying "proceed at such
a speed that you are able to stop short of any obstruction". There are a number of different types of secondary of
subsidiary signals in use and, like the main line signals, there were lots of
varieties. The most common are dealt with here.
A later version of the semaphore shunt signal was this type, with a solid red arm (left, lower), which
appeared from 1925. It showed a white light, not red, when "on". It
was also used for "calling on" and "warning" movements.
"Calling on" refers to the advance of a train into an occupied section and was
often used at stations for coupling purposes. A "warning" signal was used
to advise that the overlap beyond a stop signal is occupied. They were also used for "shunt ahead" movements -
movements which have to pass the main signal for shunting purposes, normally to then 'set
back' into a siding etc. The letter "S" was revealed when the arm was
"off", as was the letter "C" or "W".
Many semaphore shunt signals were replaced by disc signals to
improve visibility. The operation was the same and the arm was usually positioned on
a white disc. Many of these can still be seen in the UK.
Colour Light Signals
The first colour light signals appeared in
the UK in the 1920s, simply as copies of semaphores. However, with the need for
better track usage and higher speeds, the concept of multi-aspect signals arrived, giving
the driver advance warning of the condition of several blocks ahead.
A simple 2-aspect colour light signal (left) which would act as a
replacement for a semaphore stop signal. The red aspect is shown here. The other
aspect is green. A 2-aspect distant signal would have yellow and green aspects. The white plate below the signal will display an identification
plate using the reference letters of the controlling signal cabin and the signal number.
The 3-aspect signal (shown left) was developed to allow higher speeds and
shorter block sections to accommodate more trains. The three aspects are red,
yellow and green. The red indicates stop, the yellow indicates that only one block
section ahead is clear and the next signal will show a stop aspect. The green indicates
that at least two blocks ahead are clear. For more information see Multi-Aspect Signalling on this site.
The 4-aspect signal is a further development of the multi-aspect
concept. In addition to the red aspect at the bottom, this signal shows a single
yellow to indicate one block ahead is clear, a double yellow (one above the other as shown
here) to indicate two blocks ahead are clear and green to show at least three blocks ahead
are clear.
At certain location where space is limited, a 4-aspect signal can
be arranged as shown here. The red aspect is placed to one side to reduce the height
of the signal.
4-Aspect Operating Sequence
As shown in the diagram to the left (click for full size view), in an area where 4-aspect signalling is in use the sequence for the four
signals protecting the four blocks behind a train would be red protecting the occupied clock, then single yellow, double
yellow and green in the following three blocks. The view here is foreshortened for the illustration. The
signals in a 4-aspect installation will be about 750 to 850 yards (686 to 777 metres)
apart in an intensively used area and up to 1400 yards (1280 metres) apart in a high speed
area. The signals are shown without overlaps.
The sequence for 3-aspect signalling (covering only three blocks) would be the same but without the double yellow
aspect and its associated block.
Route Signalling
Signalling in the UK has always used the
principle of "route signalling" as opposed to the "speed signalling"
philosophy adopted by European and US railways. This means that drivers of a British
train will be shown which route a train will take when it proceeds past a signal
protecting a diverging junction, see diagram left (click for full size view). The speed of the train will be a matter for the
driver observing separate rules or fixed speed limit signs along the trackside. The
"speed signalling" system shows the driver what speed his train must do,
regardless of the route it will take. The interlocking of the signal at the junction
ensures that the speed aspects shown are in accordance with the route set. The result of the UK's use of the "route
signalling" philosophy is that signals display semaphore arms (as described above) or
lights which indicate the route set as shown here.
The route is
indicated by a line of five white lights which correspond to the approximate direction of
the route set. The lights are known as "a feather". They will only
light up when the route is set and locked and the signal is showing a proceed aspect. If the route is set for the track regarded as the main route ahead,
the signal will only show a proceed aspect for this route. The "feather"
will only appear to indicate a diverging route. Most examples of this signal have five
white lights but three lights are used by London Underground.
It is possible to show up to seven routes with this
type of signal. The route straight ahead will just get a plain green or yellow(s)
while the three routes to the right or left will get the green or yellow aspects, plus a
"feather". In many areas, the diversity of routes or sighting
restrictions do not allow the provision of feathers. In these cases, a number or
letter(s) is shown to the driver when the signal clears. This will indicate the
route set.
There are still some colour light junction
signals which do not have a "feather" but repeat the semaphore "splitting
distant" philosophy. At a diverging route, two signal heads, side by side, are
provided. One shows the main route, the other the diverging route.
The approach to some junctions is speed
controlled. The signal shows a restrictive aspect until the train has approached to
within a distance which has forced the driver to reduce speed. There are several
variants on how this is put into practice. For a complete description, see the
excellent page Junction
Signalling by Clive Feather.
Modern Shunt Signal
This is a typical modern shunt signal, used to allow movements into and out of a siding. It has three lights with red and white indications. The signal can be seen at ground level or attached to a signal post below a normal stop signal. When mounted below a stop signal, they do not show an "on" aspect.
The ON indication shows a red and white light side by side.
The OFF indication shows two white lights at 45 degrees. The newest ones have four
lenses and show two red lights side by side for ON.
Some Photos
The following photos show some of the more modern colour light signal designs used in Britain today.
UK standard 3-Aspect Signal at Sheffield (Midland). Below the red aspect is a sign which,
if the signal is showing a proceed indication, illuminates "RA" (Right Away) to tell the
driver station duties are complete and he can start the train. Below this is a shunt signal,
which carries no red light in this case as the red is already available on the main signal.
The signal carried a white identification plate and, nearer the ground, a signal post telephone.
3-Aspect Signal with Theatre Type Route Indicator
More Information
The Signal Box - Strongly recommended, as here you will find a good selection of the many varieties of semaphore and colour light signals on UK railways. The excellent graphics show the different positions and colours displayed by each type of signal.
Junction Signalling - An excellent page describing the approach control of junction signals in the UK by Clive Feather.
LMSR New Lines Signalling - There was a special system of colour-light signalling designed by the LMSR (London Midland & Scottish Railway) which represented almost the only attempt in the UK to install speed control signalling on a main line railway. It was installed along three LMSR lines, two in the London area and one in Yorkshire. The London installations were along the "New Lines" (the suburban lines opened in 1914) next to the main line between Euston and Watford. The other was between Bromley-by-Bow and Upminster. These are described by Clive Feather at LMSR New Lines Signalling. The Yorkshire installation was on a three mile stretch of quadruple line between Heaton Lodge Junction and Thornhill Junction and included a junction and the station at Mirfield. It is described at LMSR Mirfield Speed Signalling.
Sources: "Two Centuries of Railway Signalling", Kichenside and Williams, 1998, Oxford Publishing Company, UK; "Modern Signalling Handbook", Stanley Hall, 1996, Ian Allan Ltd, Shepperton UK; "Signalling in the Age of Steam", Michael A Vanns, 1995, Ian Allan Ltd, Shepperton UK.