- Search
-
About
- Dr. Piers Connor
- Site Map
- Infrastructure
- Signalling
- Trains
- Operations
-
Publications
- Update Log
- PhD Thesis PRC.pdf
- Gibb Report Assessment v4.pdf
- Platform Protection Systems
- Class-377 Launch Mar 2013
- The Underground Gets More Automated
- Making the most of existing capacity
- Metro Operations Planning
- Northern line upgrade interview
- Passenger Vehicle Capacity
- 50 Years on the Underground
- S Stock deliveries suspended
- High Speed Railway Capacity
- Blackpool Flexity 2 tram launch
- The Collapse of London's PPP
- Deep Tube transformation Jan 2013
- Dilemmas on doors Jan 2011
- Railway Stations-Design & Operation
- SSL Resignalling in trouble Jan 2014
- Glossary
-
Archive
- Rolling Stock Manufacturing.pdf
- Push-Pull train operation in Britain
- Multi-Deck Trains
- The Development & Principles of British Signalling
- Vehicle Suspension Systems
- Design Details of Railways, Railroads and Metros
- US Railroad Fuel Consumption
- Track Basics
- Farringdon City Sidings – Case Study PRC 010418. v1docx.pdf